U.S. AI Data Center Projects (2020–2025)
Appendix A – U.S. AI-Oriented & Hyperscale Data Center Projects (2020–2025)
|
Developer / Project (Code Name) |
Location (City, State) |
Project Details (Scale, Stage, Tactics, Incentives) |
Sources (Type & Traceability) |
|
Meta Platforms (Facebook) – Gallatin Data Center |
Gallatin, Tennessee (Sumner Co.) |
Scale: 982,000 ft² initial facility on ~800-acre campus; $800 M investment. Stage: Announced Aug 2020, construction underway; went live Nov 2023. Tactics: Recruited under code name (3-year confidential effort). Incentives: State/county economic development support (e.g. TVA solar deal for 220 MW)tnecd.com 1. ~100 permanent jobs. |
State ECD press release (official) – Verified. |
|
Meta – DeKalb Data Center |
DeKalb, Illinois (Chicago metro) |
Scale: 2.3 million ft² campus (five buildings planned); >$1 B total spend. Stage: Announced June 2020; construction took 3 years, launched traffic Nov 2023. Tactics: Open project (public announcement). Incentives: Local tax abatements; renewable energy projects (295 MW wind) to power sitedatacenterdynamics.com 2. Supports ~200 operations jobs. |
Data Center news (trade press) – Verified. |
|
Meta – Montgomery “Next-Gen” Data Center |
Montgomery, Alabama |
Scale: 715,000 ft² new “AI-optimized” data center on 1,500-acre site; $800 M. Stage: Announced May 2024 (will be Meta’s 24th DC globally); site clearing begun, operational by late 2026. Tactics: Publicly announced with state leaders. Incentives: State & local support; design to be 100% renewable and LEED Goldgovernor.alabama.gov 3. ~100 jobs. |
Governor’s press release (state PR) – Verified. |
|
Meta – Kansas City Data Center |
Kansas City, Missouri (Northland) |
Scale: ~1.4 million ft² across 3 server buildings + admin, $1 B+ investment. Stage: Broke ground 2022, went online Aug 2025startlandnews.com 4. Tactics: Project developed by Diode Ventures under “Golden Plains Technology Park.” Publicly announced (no NDA). Incentives: Local property tax abatements via Port Authority; 100% renewable energy power. ~100 jobs. |
Regional news (KC press) – Verified. |
|
Google – Northern Virginia Expansions |
Loudoun & Prince William Counties, VA |
Scale: $1 B investment to expand Google’s existing VA campuses in 2023–24 (adding to $4 B+ already in VA)datacenterfrontier.com 5. New 2023 campus in Prince William Co. launched. Stage: Announced April 2024 with Governor; active construction. Tactics: One new 181-acre complex scouted via a shell entity “Sharpless Enterprises” (Army Corps filing linked it to Google). Incentives: State partnership (e.g. $75 M AI workforce fund by Google); significant economic impact noted. |
Data center trade press – Verified. |
|
Google – Kansas City Northland Campus |
Smithville area, Missouri (KC North) |
Scale: ~500-acre land purchase for multi-phase data hub. Initial phase: 1.435 million ft² across 4 buildingsdatacenterdynamics.com 6; $1 B construction start. Ultimate build-out valued up to $10 B (long-term). Stage: Land acquired 2019–2021; plans filed 2023; local approvals in 2024. Tactics: Open development; standard zoning process. Incentives: Approved local tax incentives via Port KC; 400 MW solar PPA with Evergy to power the site. |
Data center trade press – Verified. |
|
Amazon AWS – Cloud Region Expansion (Ohio) |
Multiple sites, Ohio (Greater Columbus & beyond) |
Scale: Up to 8 new data center sites by 2030, first in Fayette County (~$5 B)aboutamazon.com 7. Builds on $6 B invested pre-2023. Stage: Initial $7.8 B expansion announced 2023, increased to $10 B by Dec 2024 to meet AI/cloud demand. First new campus underway; others in planning (e.g. Union Co/Marysville $1 B, Sunbury $2 B). Tactics: Public announcement by Governor; broad multi-site strategy (no secrecy). Incentives: State offered sales tax exemptions on IT equipment; tax credits for jobsreuters.com 8. Focus on generative AI capacity. |
AWS official blog (company PR)aboutamazon.com 9; Reuters newsreuters.com 10 – Verified. |
|
Amazon AWS – US East Region Growth (Virginia) |
Prince William & Loudoun Counties, VA |
Scale: Ongoing expansion of AWS’s largest cloud cluster. Notably, in Apr 2024 AWS bought 91 acres in Manassas for $218 M (for new data centers)datacenterfrontier.com 11. Also planning a separate 1 million ft² “Potomac Technology Park” nearby. Stage: Land acquisition and rezoning approved in early 2024. Tactics: Projects often shielded via LLCs (e.g. Amazon’s purchases under “Amazon Data Services” name). Incentives: Virginia approved up to $35 B in AWS investments by 2040 with tax breaks. Local overlay zones fast-track approvals. |
Data center news (trade press) – Verified. |
|
Amazon AWS – “Project Blue” (Secret AWS Campus) |
Tucson, Arizona (Pima Co.) |
Scale: ~290-acre planned campus for AWS, targeting multi-billion $$ (up to $24 B in equipment over 10 years)azluminaria.org 12. Compute capacity undisclosed but presumed hundreds of MW. Stage: Disguised as “Project Blue” via developer (Beale Infrastructure); land annexation into city debated mid-2025. AWS identity confirmed by local officials. Tactics: Strict NDA and shell entities used initially, with code name to mask AWS. Incentives: Arizona’s statewide data center sales tax exemption (qualifying for 10-year exemption on ~$24 B of IT gear); no additional local tax breaks promised. Significant city revenues expected ($97 M/10yr). |
Investigative local news – Verified (identity revealed). |
|
**Amazon AWS – Central Mississippi (Project AN) ** |
Madison County, Mississippi |
Scale: Multiple complexes across two industrial parks; projected total >3.4 million ft². $10 B investment – largest in MS historyaboutamazon.com 13. ~1000 jobs. Stage: Announced Jan 2024; ground broken mid-2024. Tactics: Initial negotiations under code-name; revealed via state EDA. Incentives: Mississippi certified AWS as a “Data Center” to grant 10-year sales and franchise tax exemptionsdatacenterdynamics.com 14. Local authorities provided land in MCEDA parks. Workforce training and STEM programs funded by AWS. |
AWS official release – Verified; DCD newsdatacenterdynamics.com 15. |
|
Amazon AWS – Indiana Campus |
St. Joseph County, Indiana (New Carlisle) |
Scale: Massive multi-building campus on ~600+ acres; $11 B investmentreuters.com 16. At least 1,000 jobs. Stage: Announced Apr 2024; construction begun 2024. Tactics: Standard economic development approach (no shell needed); publicly touted as state’s largest-ever capital project. Incentives: 50-year state sales-tax exemption on infrastructure; $78 M+ in state tax credits and training grants. Emphasized generative AI capacity for AWS. |
Reuters News – Verified. |
|
Amazon AWS – North Carolina Region |
Richmond County, North Carolina |
Scale: New greenfield campus (exact acreage not listed) to anchor AWS expansion in NC; $10 B planned investmentaboutamazon.com 17. ~500 jobs. Stage: Announced June 2025 by state officials as one of largest in NC history. Construction prep in 2025. Tactics: Open announcement (no alias). Incentives: Expected use of NC’s incentive grants; AWS launching local community fund and workforce training (STEM programs). Aimed at AI cloud growth. |
AWS official blog – Verified. |
|
Amazon AWS – Northeastern Pennsylvania Campuses |
Salem Twp (Luzerne) & Falls Twp (Bucks), PA |
Scale: Two large “innovation campus” sites – one in NE PA near a nuclear plant – for cloud/AI. $20 B+ total investmentaboutamazon.com 18; 1,250 new jobs. Stage: Announced June 2025 with Governor; early development phase. Tactics: Open announcement (largest private investment in PA history). Incentives: Anticipated use of PA DC incentive program; workforce development partnerships and a $250k community STEM fund. Will bolster AI infrastructure nationally. |
Amazon release – Verified. |
|
EdgeCore – Culpeper Tech Zone Campus |
Culpeper County, Virginia |
Scale: 120-acre campus in designated Tech Zone. Initial phase: 1.4 M ft² supporting 216 MW IT load, scaling to ~432 MWdatacenterfrontier.com 19. Stage: Land acquired July 2024; build-out through 2028 (power available by then). Tactics: Openly coordinated with county’s pre-zoned tech district (no secrecy needed). Incentives: Local Tech Zone incentives (streamlined approvals, pre-addressed community concerns like water use). EdgeCore touts minimal water, closed-loop cooling for community goodwill. |
Data Center trade article – Verified. |
|
PowerHouse Data Centers – “PH95” Campus |
Spotsylvania County, Virginia |
Scale: ~800 MW mega-campus on 234 acres along I-95. Three 300 MW substations planned; first 150 MW by Oct 2025. Ultimately 8+ high-density data centers. Stage: Groundbreaking in 2024. Tactics: Announced via company LinkedIn (public); branding as “PowerHouse 95”. No shell LLC. Incentives: Local partnership with county; leveraging existing transmission capacity (2 substations on-site). Parent AREP and partner Harrison Street investing $1 B (6 data centers, 2.1M ft² by 2026). |
Data Center trade article – Verified. |
|
Amazon (Project Tree) – Wallula Gap Campus |
Wallula, Washington (Walla Walla Co.) |
Scale: 500-acre site (Port of Walla Walla) for 16 data centers totaling ~3.4 M ft²datacenterdynamics.com 20. Estimated $4.8–5 B build cost. Four phases of 125 acres each; ~500 MW total capacity. Stage: Disguised as “Advance Phase LLC” (shell for a U.S. tech giant described exactly as Amazon); land sale approved Oct 2024. Code name “Project Tree” used in negotiations. Tactics: Heavy secrecy until port meeting; alias LLC and code name employed. Incentives: Port selling land at $32 M; Washington offers sales tax exemptions for rural data centers (likely applicable). Project in heavy-industrial park with rail & highway access. |
DataCenterDynamics (trade) – High confidence (shell identity). |
|
Compass Datacenters – Meridian Campus |
Meridian, Mississippi (Lauderdale Co.) |
Scale: Eight-building hyperscale campus, ~250k ft² and 40 MW IT load each (total ~2 M ft², 320 MW)datacenterdynamics.com 21. Valued at $10 B (including tenant IT gear). Stage: Announced Jan 2025; broke ground Feb 2025. Compass (developer) will build shells for large cloud tenants. Tactics: Open announcement with Governor; not attributed to a single end-user (speculative tenants, rumored AWS or others). Incentives: State certified data center project – 10-year income and franchise tax exemption. Local utility (Miss. Power) committing 500 MW electrical infrastructure. |
DataCenterDynamics (trade) – Verified. |
|
Compass / TPG – Prince William “Digital Gateway” |
Prince William County, Virginia |
Scale: Master-planned campus up to 11.55 M ft² of data centers across ~800+ acres (portion of new PW Digital Gateway area). Multi-hundred MW potential. Stage: Land use change approved Nov 2022; Compass planning underway by 2023. Tactics: Initial plans by Quantum Loophole were superseded; now led by TPG Real Estate after community pushback. Public zoning but project specifics under wraps (speculative phases). Incentives: County created “Data Center Opportunity” overlay with fast-track rezoning. Likely large infrastructure upgrades (power, roads) financed in part by developers. Confidence: Plans noted in industry press, but no official groundbreak yet (speculative until site plans filed). |
Trade press (DCD) – Planning stage (speculative). |
|
Quantum Loophole (QLoop Frederick) |
Adamstown, Maryland (Frederick Co.) |
Scale: 2,100-acre “data center city” campus on former Alcoa site, targeting ~1 GW power capacity. Multi-tenant mega-campus with fiber ring (“QLoop”). Stage: Land bought June 2021; initial site plan approved 2022. Tactics: Privately developed master-plan; high transparency with local officials, though later Quantum Loophole was removed from active role (TPG took over) amid execution challengesdatacenterdynamics.com 22. Incentives: County approved innovative master plan; project touted to generate $41 M/year in local taxesconduitstreet.mdcounties.org 23. Some community opposition over environmental impact. (Status: continuing under new ownership, with first tenants like Aligned securing parcelsdatacenterdynamics.com 24.) |
Local news / DCDdatacenterdynamics.com 25datacenterdynamics.com 26 – Verified (project ongoing). |
|
Atlas Data Centers – “Project Sail” |
Newnan, Georgia (Coweta County) |
Scale: 832-acre campus, 13 data halls @ 378k ft² each (~4.9 M ft² total)datacenterdynamics.com 27. No IT MW given (adjacent 700 MW power plant for reference). Stage: Development of Regional Impact (DRI) filing Jan 2025; rezoning underway (county vote May 2025)datacenterdynamics.com 28. Tactics: Kept semi-stealth as “Project Sail” until filing. Atlas Development LLC is little-known; website minimal. Incentives: State DRI process implies significant economic impact (claimed $1.6 B/year tax revenue – likely overstated). Local authorities supportive; specifics of incentives not public. (Confidence: Plans filed with state – credible.) |
Trade press (DCD) – Verified (plans filed). |
|
Atlas – “Project Gracie” and GA Portfolio |
Rome & Atlanta region, Georgia |
Scale: Atlas also proposed a 7-building, ~2.4 M ft² campus near Rome (Coosa)datacenterdynamics.com 29; plus a 178-acre second Rome site, a 2.2 M ft² (6-building) campus in Bartow Co., and a 428-acre tech park in Villa Rica. Total dozens of buildings statewide. Stage: Filed DRIs in 2024–25 for each (“Project Gracie” in Floyd Co. filed May 2025; others in 2024). Some rezoning approvals in process. Tactics: Code names (Gracie, Sail, etc.) used before public filings. Little public info on Atlas; projects appear speculative but advanced through official channels. Incentives: Likely pursuing local tax abatements via GA development authorities; state touts rapid DC growth with “tens of millions sq ft” in pipeline. (Confidence: Filings and local news confirm activity.) |
Trade press (DCD) – Verified (planning). |
|
Microsoft – East US3 (Atlanta) Region |
Fulton, Douglas & Paulding Co., Georgia |
Scale: Multi-site Azure cloud region in metro Atlanta. Includes two new DC campuses in South Fulton and Douglas County, plus others (~350-acre in Palmetto, GA)azure.microsoft.com 30datacenterdynamics.com 31. Total investment not fully disclosed (est. >$1–2 B). Stage: Announced 2021; land acquired 2020–21; construction ongoing through 2023. Tactics: Public announcement (no aliases) of “East US 3” Azure regionfacebook.com 32. Incentives: State and counties provided standard tax abatements (Fulton Dev. Authority approved incentives amid some local debate)reddit.com 33. Emphasis on workforce and community programs by Microsoft. |
Microsoft blog / local EDCazure.microsoft.com 34reddit.com 35 – Verified. |
|
Microsoft – Mount Pleasant Campus (Foxconn site) |
Mount Pleasant, Wisconsin (Racine Co.) |
Scale: At least 315-acre initial phase (on ex-Foxconn land), expanding to full 2,500-acre tech park. Phase 1: 3 data centers (~2.5 M ft²) with 300+ MW, $1 B investmenthuschblackwell.com 36. Phase 2: additional ~$2.3 B (by 2026) for total $3.3 B AI-centric expansionconstructiondive.com 37news.microsoft.com 38. Stage: Land purchase approved April 2023; construction started late 2023. Expanded AI investment announced May 2024 with White House involvement. Tactics: Initial project under wraps until land deal done (referred to as “Project Phoenix” locally). After approval, Microsoft openly promotes AI hub vision. Incentives: Local village and county agreed to infrastructure support; state enterprise zone benefits. Lake Michigan water allocation approved for cooling (up to 2.8M gal/day)jsonline.com 39. Using union labor (2,300 construction jobs). |
Local news / MS Source PRconstructiondive.com 40news.microsoft.com 41 – Verified. |
|
OpenAI/Oracle/SoftBank – “Stargate” Project |
Abilene, Texas |
Scale: First-of-its-kind AI supercomputing campus; 1.2 GW (!) planned IT loadenergynow.com 42, dozens of GPU-rich data halls. Building a dedicated gas power plant on-site. Stage: Construction fast-tracked in 2024; by Mar 2025 site under heavy build (goal to be fastest 100+ MW DC build). Announced at White House Jan 2025. Tactics: Development by “Stargate LLC” (JV of OpenAI, Oracle, SoftBank, et al.), code name “Project Ludicrous” during initial planning. Highly secret until public reveal in late 2024. Incentives: Close partnership with federal initiatives (positioned as strategic AI infrastructure). Local incentives undisclosed, but Abilene provided land and expedited permitting; project needed custom energy infrastructure (private generation). (Confidence: Publicly confirmed via Bloomberg reporting, government event.) |
Bloomberg Businessweek via EnergyNow – Verified. |
|
Elon Musk / xAI – Memphis Data Center (rumored) |
Memphis, Tennessee (Shelby Co.) |
Scale: (Speculative) – A potential hyperscale site to support xAI startup. Mentioned in context of OpenAI’s plans. No public details on size (possibly hundreds of MW). Stage: Rumored 2024; not officially announced. Tactics: Was indirectly referenced as Musk choosing Memphis for a data center instead of joining Stargate. No filings or confirmation publicly available by 2025. Incentives: Unknown – would likely seek local incentives if pursued. Confidence: Low. Only a passing mention in media; no traceable documentation. Included for completeness as an industry rumor. |
Bloomberg Businessweek (mention) – Unverified rumor. |
Source Legend: State/city filings and press releases, local/regional news, and industry trade reports are used above for traceability. Each project entry cites at least one primary source (official or journalistic) as noted.
tnecd.com 43 Governor Lee, Commissioner Rolfe Announce Facebook to Build $800 Million Data Center in Gallatin - News - Tennessee Department of Economic and Community Development
datacenterdynamics.com 44 Meta launches data center in DeKalb, Illinois - DCD
governor.alabama.gov 45 Governor Ivey Announces Meta Plans to Build $800 Million, Next-Generation Data Center in Montgomery -
startlandnews.com 46 Meta’s billion-dollar KC data center just came online; here’s what the region expects it to generate – Startland News
datacenterfrontier.com 47 Land and Expand: Virginia Data Centers | Data Center Frontier
datacenterdynamics.com 48 Google to build $1bn data center in Kansas City, Missouri - DCD
aboutamazon.com 49 AI and cloud infrastructure in Ohio gets $10 billion Amazon investment
reuters.com 50 Amazon to invest $11 billion in Indiana to build data centers | Reuters
azluminaria.org 51 Project Blue data center inevitable says Tucson council member Nikki Lee - AZ Luminaria
aboutamazon.com 52 AWS plans to invest $10 billion in Mississippi
datacenterdynamics.com 53 Compass Datacenters breaks ground on $10bn campus in Meridian, Mississippi - DCD
aboutamazon.com 54 Amazon to invest $10B in North Carolina to expand cloud infrastructure and advance AI
aboutamazon.com 55 Amazon plans to invest $20B in Pennsylvania to expand cloud infrastructure, advance AI innovation
datacenterdynamics.com 56 $4.8bn data center campus proposed in Walla Walla, Washington - DCD
datacenterdynamics.com 57 Quantum Loophole no longer involved in Quantum Frederick Project ...
conduitstreet.mdcounties.org 58 Tech Council Study: Frederick Data Center Project Represents $41 ...
datacenterdynamics.com 59 Aligned looks to develop three more data centers at Quantum ...
datacenterdynamics.com 60 $17bn 'Project Sail' data center campus proposed in Atlanta, Georgia - DCD
datacenterdynamics.com 61 Atlas plans 2.4 million sq ft data center campus outside Rome, Georgia - DCD
azure.microsoft.com 62 Microsoft will establish its next U.S. datacenter region in Georgia's ...
datacenterdynamics.com 63 Microsoft to develop 350-acre data center campus in Rome, Georgia
facebook.com 64 Microsoft announced plans Thursday to invest $4 billion for the ...
reddit.com 65 Fulton County Agency Okays Microsoft Data Center Incentives - Reddit
huschblackwell.com 66 Case Study | Microsoft Corporation - Husch Blackwell
constructiondive.com 67 Microsoft plows $3.3B into data center at former Foxconn site
news.microsoft.com 68 Microsoft announces $3.3 billion investment in Wisconsin to spur artificial intelligence innovation and economic growth - Source
jsonline.com 69 Microsoft project to use 2.8 million gallons of Lake Michigan water
energynow.com 70 Inside the First Stargate AI Data Center - Energy News, Top Headlines, Commentaries, Features & Events - EnergyNow.com
Sources
Unique citations: 17 · In-text mentions: 70